| Tree Lowering Project |
Tana Oil &
Gas Corporation |
Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB200 (120) winch and custom over boarding sheave skid package. |
2007 |
| Independence HUB - Merganser |
Helix Energy Solutions |
Provide custom umbilical pull-in system on the Anadarko Independence FPF for the installation of (1) umbilical. The system include a VB50 (26) winch and custom winch tower. |
2007 |
| Campos Basin Project |
Devon Energy Brazil |
Provide custom riser and power cable pull-in systems on the Devon Platform for the installation of (2) risers and (1) power cable. The riser system includes include a VB75 winch, a custom winch skid package and (4) rolling blocks. The power cable system includes a VB12.5 winch and (2) rolling blocks. |
2007 |
| Atlantis - Umbilical |
BP Americas |
Provide custom umbilical pull-in systems on the Atlantis PQ for the installation of (4) umbilical. The umbilical system includes include a VB300 (70) winch, a custom winch/ sheave skid package and (2) sheave assemblies. |
2007 |
| URSA - Umbilical |
Oceaneering International |
Provide custom umbilical pull-in systems on the URSA TLP for the installation of (1) umbilical. The umbilical system includes include a VB75 winch. |
2007 |
| Thunder Horse - Debris Recover |
BP Americas |
Provide custom recover system onboard the Maresk Reliance for the recovery of debris on the seafloor. The recovery system includes a VB80 (50) winch and custom over boarding sheave skid package that extended off the side of the vessel. |
2007 - 2006 |
| Eugene Island 314A - Jacket Repair |
Exxon/Mobil |
Provide custom lowering system onboard the platform for the removal of existing jacket members and for the lowering of new jacket members. The system includes (6) VB30 winches, (2) VB 12.5 Winches, (8) custom skid packages, (4) sheave assemblies and (6) rolling blocks. |
2007 - 2006 |
| BP - Amherstia Platform |
BP Trinidad & Tobago |
Provide custom jacking system onboard the Amherstia platform for up righting the Gas Compressor Skid. The system includes (4) jacks with custom jacking frames. |
2007 - 2006 |
| Okume Complex - EG, West Africa |
Amerada Hess Corporation |
Provide (2) custom riser systems one onboard the Okume platform and the second onboard the Oveng platform. Each system includes a VB200 (42) winch, a custom winch/sheave skid and (2) sheave assemblies. Also we are providing a custom power cable system onboard the Okume B/D platforms. The system includes (2) VB12.5 winches, (2) custom sheave skids and (2) rolling blocks. |
2007 - 2006 |
| Chevron - Tahiti Platform |
Subsea 7 Marine |
Provide custom umbilical pull-in systems on the Chevron's Tahiti SPAR for the installation of (4) umbilical. The umbilical system includes include a VB100 winch. |
2007 |
| Hang-Off Skid Package, Subsea 7 Brazil |
Subsea 7 Marine |
Provide Engineering, drawings |
2006 |
| "Cottonwood" Subsea Tree Installation |
Petrobras America, Inc. |
Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB200 (42) winch and custom over boarding sheave skid package. |
2006 |
| West Delta 95 - X-Clamp Installation |
BP Americas |
Provide custom lowering system onboard the platform for the lowering of (2) X-Clamp Braces. The lowering system includes (4) VB30 winches. |
2006 |
| Platform - Bridge Repair |
Apache Corporation |
Provide custom lifting truss system that cantilevers off one platform for holding a damaged bridge while it is being repaired. The system includes a VB80 (50) winch, VB30 winch, a custom truss skid, and (2) sheave assemblies. |
2006 |
| Eugene Island 330 - Deck Lift |
Devon Energy |
Provide custom jacking system onboard the platform for the lifting. The jacking system includes (32) jacking rams. |
2006 |
| Shell - Deimos |
Subsea 7 Marine |
Provide custom umbilical pull-in systems on the Shell's Demois platform for the installation of an umbilical. The umbilical system includes a VB80 (50) winch, custom cantilever sheave skid, and (2) rolling blocks. |
2006 |
| Subsea Tree Lowering |
Newfield Exploration Company |
Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB300 (70) winch and custom over boarding sheave skid package. |
2006 |
| Chevron - Tahiti |
J. Ray McDermott |
Provide (2) separate custom riser pull-in system onboard the Chevron's Tahati SPAR. One for the installation of (6) Flowline Risers, and the other for the steering of (2) Export Risers during installation. The flowline riser system includes a custom chain jack, (2) powered chain turndown sheaves assemblies, (3) horizontal chain assemblies, and a custom chain locker to store 1700-ft of 3 ¾" chain. The export riser system includes (2) VB75 winches. |
2007 - 2006 |
| Lobito Tomboco - Angola , West Africa |
Subsea 7 Marine |
Provide custom umbilical/jumper pull-in systems on the Chevron's Compliant Tower for the installation of (4) umbilicals & (7) jumpers. The system includes (2) VB75 winches, (2) custom sheave skid, an I-Tube Sheave Assembly and (7) rolling blocks. |
2006 - 2005 |
| BP - Mad Dog Skid Installation |
BP Americas |
Provide custom lifting/installation systems on the Mad Dog Platform for lifting, cross hauling under the deck and then setting. The system includes (4) VB30 winches, (2) multiple cantilever sheave skids, and (4) sheave skids. |
2006 |
| Subsea Tree Lowering |
Deep Gulf Energy |
Provide custom tree lowering system onboard a drill dig platform for the lowering of (1) subsea tree. The lowering system includes a VB200 (42) winch and custom over boarding sheave skid package. |
2006 |
| Genghis Khan Riser Installation (Marco Polo) |
Anadarko Petroleum Corporation |
Provide custom riser installation systems on the Marco Polo TLP for installing (2) production risers. The system includes a VB300 (70) winch used for pull-in the risers, a VB100 and VB80 (50) winches for steering the riser. Each winch has a sheave skid and a sheave assembly. |
2005 |
| Independence HUB |
Subsea 7 Marine |
Provide custom umbilical pull-in system on the Anadarko Independence FPF for the installation of (4) umbilicals. The system includes a VB50 winch and custom winch tower. |
2007 |
| Genghis Khan Umbilical Installations (Marco Polo) |
J. Ray McDermott |
Provide an umbilical pull-in winch with operators for the installation of the Genghis Khan control umbilical on the Marco Polo TLP. |
2005 |
| GC 518 Riser Installations |
Anadarko Petroleum Corporation |
Supply 300-Ton, 100-Ton and 80-Ton winches with beampackages and turndown sheaves for the installation of two 6-inch risers on the Marco Polo TLP |
2005 |
| Thunder Horse riser installation chain jack refurbishment |
BP Americas |
Re-furbish and repair 600-Ton hydraulic chain jack, perform dynamic load test and acceptance tests on shore, fabricate shipping and handling frame |
2005 |
| Fabricate and SIT Atlantis seabed riser stabilization system |
BP Americas |
Fabricate thirteen (13) seabed chain stopper systems and six (6) pipeline yokes to stabilize Atlantis risers at seabed. Provide full fabrication traceability and full SIT in Houston . |
2005 |
| Lorien Tie-backs |
Noble Energy & Shell Offshore |
Provide custom winch systems on the Shell Bullwinkle platform for the removal of existing flowlines and umbilicals. Installed in two (2) J-tubes and the installation of new risers and umbilicals in the same J-tubes. |
2005 |
| J-Bellus Umbilical Installation |
Shell Offshore & LLOG Exploration |
Provided 100-Ton winch with custom beam package and multiple sheaves for the installation of the J-Bellus umbilical at the Shell Brutus TLP |
2005 |
| Triton/Goldfinger |
Technip & Dominion Exploration & Production |
Provided 300-ton, 80-ton and two (2) 30-ton winches with custom beam packages and multiple turndown sheaves for the installation of the production risers at the Devils Tower par for the Triton/Goldfinger developments |
2005 |
| K-2 Riser Installations |
Technip & ENI |
Supply 300-Ton, 100-Ton and 30-Ton winches with beam packages and turndown sheaves for the installation of four (4) 6-inch risers on the Marco Polo TLP |
2005 |
| Shell Glider umbilical installation (Brutus TLP) |
Subsea7 & Shell Offshore |
100-ton or 200-ton hydraulic winch pulling system (final scope to be determined) including all layout engineering, drafting and project management and operations personnel. |
2003 |
| Multiple stranded vessel salvages (post Hurricane Katrina) |
Various |
Provide barge mounted custom pulling systems with capacities ranging from 250 to 3,000 tons for the salvage of stranded vessels and dry docks post Hurricane Katrina |
2005 |
| Horn Mountain Oil Export Riser SCR replacement Project |
BP Americas |
Design and engineer complete repair procedure, furnish all equipment (including two (2) 600-Ton hydraulic chain jacks) and operators for the replacement of the Flex Joint on the main oil export riser |
2005 - 2004 |
| Thunder Horse SCR Installations |
Heerema & BP Americas |
Provide eleven (11) hydraulic winch systems (200-Ton to 30-Ton) for the installation of production and export risers on the Thunder Horse PDQ |
2005 - 2004 |
| Thunder Horse Jumper Installation |
Subsea 7 & BP Americas |
Rental of 200-Ton series 120 hydraulic winch for lowering 70-ton jumpers in 6,000 feet of water. Additional 100-Ton winch for pennant line handling. Provide operators and technicians |
2005 - 2004 |
| Thunder Horse Umbilical Installation |
Subsea 7 & BP Americas |
Provide 80-Ton hydraulic winch with level wind for the installation of multiple umbilicals on the Thunder Horse platform. Provide operators and technicians. |
2005 - 2004 |
| Thunder Horse Water Injection Riser Installation |
Technip & BP Americas |
Provide five (5) hydraulic winch systems (200-Ton to 40-Ton) for the installation of Water Injection Risers on the Thunder Horse PDQ |
2005 - 2004 |
| Conoco Magnolia Export Lines |
Allseas Marine & Shell Offshore |
Provide 100-Ton winch support on custom beam packages for two (2) J-Tube pulls on the Shell Enchilada platform |
2004 |
| Jack and Shim Holstein Drilling Rig |
BP Americas |
Provide flat jacks and associated equipment and operators to jack and shim the 4,000 Ton Holstein drilling module on the Spar after installation |
2004 |
| Pompano I-Tube Retrofit |
BP Americas |
Provide two (2) 30-Ton hydraulic winches with operators for the installation of retrofit I-tubes on the Pompano platform. |
2004 |
| Marco Polo Riser Installation |
Cal Dive International |
200-Ton winch and operations personnel for multiple riser installations on TLP |
2004 |
| Marco Polo Subsea lowering winch |
Cal Dive International |
100-Ton winch outfitted with 6,500 feet of wire for the Subsea lowering of a 16-Ton clump weight for crane block stabilization |
2004 |
| Taylor Energy Jacket Launch |
McDermott & Taylor Energy |
Provide two (2) synchronized 450-Ton pull systems on the I-600 barge for the launch of a Taylor Energy jacket |
2004 |
| Exxon Kizomba "A" Umbilical Installation |
Saipem |
100-Ton winch on custom support skid plus operators for the installation of multiple umbilicals onto an FPSO |
2004 |
| Onshore Pipe Spooling |
Technip |
Provide 100-Ton constant tension winch for onshore pipe spooling operations at spool base |
2004 |
| BP Thunder Horse SCR and WI Riser Installation |
Heerema, Technip & BP Americas |
Provision of all winches, custom support structures, engineering, fabrication, project management, operations personnel for the installation of all risers on the Thunder Horse PDQ. |
2004 - 2003 |
| Amerada Hess Conger Jumper Installations |
Amerada Hess |
100-ton winch and rigging for the subsea lowering of multiple jumpers in 2,000 ft water depth, including all layout engineering, drafting, project management and operations personnel |
2003 - 2004 |
| Shell Nakika SCR Installations - Phases 1 and 2 |
Shell Offshore & BP Americas |
Provide two (2) 50-Ton hydraulic winches and design and fabricated custom support structure to support all winches, provide all associated equipment and personnel for the lateral steering of the Nakika SCR's during installation. |
2004 - 2003 |
| Gunnison Riser Installations |
Cal Dive International |
200-ton winch and operations personnel for multiple riser installations on Spar |
2003 |
| Gunnison Foundation Installation |
Cal Dive International & Kerr McGee |
Provide 200-Ton hydraulic winch with all associated equipment and personnel for the seabed lowering operations for pile installation on the Gunnison project. |
2003 |
| BP Holstein Truss Loadout and Float Off |
Gulf Marine Fabricators & BP Americas |
Provide four (4) custom 750-Ton pulling and holdback systems with centralized PCL based control system for the loadout and controlled float off of the 11,000 Ton Holstein truss section. Include all PM, engineering, design, operations personnel and management. |
2003 |
| Shell Princess Rig Winch Lowering System |
Shell Offshore |
Provide 200-Ton winch with 7,500 feet of 2-1/2 inch wire, plus cantilever beam package and turndown sheave for the seabed installation of well heads, BOP's and subsea flowline initiation. |
2003 |
| Shell Princess Umbilical Installation |
Stolt & Shell Offshore |
Design and fabricate 65-feet beam package, provide 100-ton winch and all associated equipment and operators for the Princess umbilical installation. |
2003 |
| Shell Habanero Umbilical Installation |
Stolt & Shell Offshore |
Design and fabricate custom H-frame for turndown sheave support, provided 100-Ton hydraulic winch and all associated equipment and personnel for umbilical pull-in. |
2003 |
| Shell Llano Umbilical Installation (Auger TLP) |
Subsea 7 & Shell Offshore |
Design and fabricated custom H-frame for turndown sheave support, provided 100-Ton hydraulic winch and all associated equipment and personnel for umbilical pull-in. |
2003 |
| Shell Glider Riser Installation (Brutus TLP) |
Subsea 7 & Shell Offshore |
Load testing and certification of 275-Ton chain jack, offshore operation of chain jack |
2003 |
| Shell Glider Umbilical Installation (Brutus TLP) |
Subsea 7 & Shell Offshore |
100-Ton hydraulic winch pulling system including all layout engineering, drafting, project management and operations personnel. |
2003 |
| Shell Nakika Umbilical Installations |
Subsea 7 & Shell Offshore |
Provide three (3) 100-Ton winches with turndown sheaves, all associated equipment and operators for the installation of the Nakika platform umbilicals |
2003 |
| King Eastern TSJ Repair |
BP Americas |
Project Management, engineering, design, provision of eight (8) winch systems, underwater rigging, operations management, operations personnel (8) for the removal and re-installation of SCR on the Marlin TLP. |
2002 |
| Multiple BP Jacket loadouts at McDermott |
BP Americas & J Ray McDermott |
Two (2) 500-Ton pulling systems using blocks and winches |
2002 |
| Nansen Riser Installation |
Cal Dive International & Kerr McGee |
Provide 200-Ton hydraulic winch, all associated equipment and operations personnel for the pull-on of an SCR on the Nansen Spar |
2002 |
| Williams MP 261 Deck Pancake Installation |
Williams Co. |
Engineer and fabrication of custom support skids, all PM and layout engineering, provide four (4) 30-Ton hydraulic winches with all associated equipment and personnel for the installation of a 65-Ton deck pancake on the MP 261 platform |
2002 |